RAPID TEST MANUFACTURING GUIDE
Rapid Test Production Flow
Prepare the four main test components separately, combine them through lamination, cut the laminated card into test strips, then complete pouching and packing.
COMPONENT PREPARATION
Prepare the Four Test Components
Each component follows its own preparation process before entering lamination.
COMPONENT 01
Label Pad / Conjugate Pad
COMPONENT 02
Nitrocellulose Membrane
Reagent
Reagent
COMPONENT 03
Sample Pad
COMPONENT 04
Absorbent Pad
COMPONENT ASSEMBLY
Lamination
The prepared components are positioned on the backing card to form the laminated master card.
MASTER CARD CUTTING
Cut the Laminated Master Card into Test Strips
After lamination, the completed master card is cut into narrow individual test strips for downstream production.
FINAL PRODUCTION STAGE
Pouching & Packing
Test strips are assembled into the plastic device and then placed into the required pouch and secondary packaging.
Manual / Assisted
Cassette Assembly Roller GDY014
Supports cassette pressing while loading and packing remain operator-assisted.
Automatic
Cassette Assembly and Pouching Machine ZKZD100
Automatic cassette assembly and pouching for scaled production.
Automatic
Cassette Assembly and Pouching Machine ZKZD200
Automatic assembly and pouching configuration for higher-volume production.
FINAL OUTPUT
Finished Rapid Test
24/7 Consultation
Round-the-Clock Expert Support for Your Peace of Mind.
Full On-Site Support
Professional engineers provided full assistance throughout the process.
2-Year Guarantee
Stable after-sales support leads to a higher return on production investment.
Custom Design
From design drawings to finished product, we offer a complete solution.
International Certification
Leave your contact information and tell us what equipment or raw materials you are looking for. We will contact you as soon as possible to help you provide the most suitable solution.
- +86 13671664698
- inquiry@veldiautomation.com





